The Spring Line · East Toronto + Waterfront

East Toronto,
decoded

The east end is in its spring — new transit, a rising waterfront, fresh ground breaking. We’re the line through it: real data, real opinions, zero fluff, since 2016.

Stops on the line

All stations
The Line Extension

The Waterfront line is now under construction.

Port Lands: done. Villiers Island: rising. East Harbour: a second downtown. We have been riding this route since before the tracks were laid.

East Harbour

Toronto’s next downtown, 100K+ daily.

Villiers Island

A brand-new island on the Don.

Port Lands

800 acres, a naturalized river.

Ride the waterfront

Thinking about a move to the east end?

Ride with us